Sub Bid Requests

 
DeSilva Gates Construction (DGC) is preparing a bid as a Prime Contractor for the project listed below:
 
PROJECT:                
FLORIN ROAD BICYCLE AND PEDESTRIAN IMPROVEMENT PROJECT – Contract No. 4526
Disadvantaged Business Enterprise Goal Assigned is 21%
 
OWNER:                   
COUNTY OF SACRAMENTO – 9660 Ecology Lane, Sacramento, CA 95827
            
REVISED BID DATE:               JULY 11, 2024 @ 2:00 P.M.          ESTIMATOR:PAUL BRIZUELA
 
DGC is soliciting quotations from certified Disadvantaged Business Enterprises, for the following types of work and supplies/materials including but not limited to:
 
Adjust Iron, Cold Plane, Electrical, Landscaping, Minor Concrete, Roadside Signs, Sawcutting, Striping, Testing, Traffic Control Systems, Underground, Trucking, Water Trucks and Class 2 Aggregate Base Material
 
Plans and specifications may be reviewed at our offices located at 11555 Dublin Boulevard, Dublin, CA or 3855 N Freeway Blvd Suite 100, Sacramento, CA 95834, or at your local Builders Exchange, or reviewed and downloaded from the dropbox site at https://www.dropbox.com/sh/5rvdc1bwfbasgl9/AABbrd0ba51_kN3GtAESfBUoa?dl=0 or from the Owner’s site at www.dot.ca.gov/hq/esc/oe/weekly_ads/all_adv_projects.php
 
Fax your bid to (925) 803-4263 or email to dgcestimating@desilvagates.com to the attention of Estimator Paul Brizuela. If you have questions for the Estimator, call at (925) 829-9220.  When submitting any public works bid please include your DUNS number and DIR number.  For questions regarding registration for DIR use the link at www.dir.ca.gov/Public-Works/PublicWorks.html
 
If you need DBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this projectcall the Estimator at (925) 829-9220, or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). DGC is willing to breakout portions of work to increase the expectation of meeting the DBE goal.
 
At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. DGC is an Equal Opportunity/Affirmative Action Employer.
 

DeSilva Gates Construction - FLORIN ROAD BICYCLE AND PEDESTRIAN IMPROVEMENT PROJECT – Contract No. 4526


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive