|
Sub Bid RequestsNW CONSTRUCTION, INC. 904 Walleye Road Bozeman, MT 59718 Is requesting Small Business (SB), Small Disadvantaged Business (SDB), Woman-Owned Small Business (WOSB), HUBZone Small Business (HUBZone), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Indian Small Business Economic Enterprises (ISBEE) quotes for the following Project: B.F. Sisk Dam SOD Modifications, Phase II 12 miles west of Los Banos, CA Merced County Solicitation No: 140R2024R0015 Project Owner: Bureau of Reclamation BID DATE: 01/13/2025 @ 12:00 PM PT Must receive quotes no later than January 9, 2025 Point of Contact: Mike Corcoran (406) 587-1907 Email Quotes To : mike.corcoran@nwconstruction.us General Work Description : Construction of modifications to the existing B.F. Sisk Dam, including construction of shear key, berms, internal drainage zones, quarry development, crushing, installation of toe drains, inspection wells, weir boxes, instrumentation, drainage ditches, precast concrete box culverts, and access roads. Plans and specifications can be accessed at: https://sam.gov/opp/48b49013c789422cb85a530156a56045/view OR by emailing mike.corcoran@nwcontruction.us NW Construction, Inc. is requesting quotes from qualified Subcontractors and Suppliers including Certified SB, SDB, WOSB, HUBZone, SDVOSB, and ISBEE firms for the following work, including, but not limited to: Site Security, Petroleum, Oil, Lubricants Supplier, Office Cleaning, Survey, Trucking, Traffic Signage, Safety Fence, Exclusion Fence, Stormwater Pollution Prevention Plan (SWPPP) Supplies, Installation and Maintenance, Metal Fabrications, Dust Palliative, Dewatering, Instrumentation Installation, Slope Stability Monitoring Service, Vibrating-Wire Piezometers, Clearing and Grubbing, Stripping, Excavation, Geotextiles, Removal of Existing Asphalt Pavement, Asphalt Concrete Pavement, Road Maintenance, Chain Link Fencing, Restoration and Revegetation, Precast Concrete, and HDPE Pipe Supply. NW Construction, Inc. is an Equal Opportunity Employer and will work with any interested subcontractor or supplier to break items into any economically feasible packages. Please contact us for any technical assistance. Quotations must be valid for the same duration as specified by the Owner for contract award. This project has Total Small Business goal of 42%. Please include Contractor License Number, Unique Entity Identifier (UEI), and any relevant Small Business Certifications with your quote. NW CONSTRUCTION, INC. - B.F. Sisk Dam SOD Modifications, Phase II Email To Friend« Go Back |
|