|
Sub Bid Requests
REQUEST FOR Sub-Proposals from Certified DBE Firms
Project Name: North Park/Mid-City Bikeways: University Bikeway Rebid Contract Number: 1223081 Owner: SANDAG DBE Goal: 23% Subcontractors/Subconsultants/Vendors wanted for: (Subcontractors): Reinforcing Steel, Minor Concrete, Minor Structures, Asphalt Paving, Asphalt Dike, Slurry Seal, Fence & Railing, Signage & Striping, Electrical, Traffic Signals, Traffic Loop Detector, Street Sweeping, Asphalt Cold Milling, Sawcutting, Tree Removal, Surveying, Quality Control, Trucking Landscape & Irrigation, Clear & Grubb, Traffic Control, SWPPP, Job Coordinator and Painting. (Suppliers): RCP, Detectable Warning Tiles, Ready-Mix Concrete, Colored Concrete, Aggregates, Sound Control, Stormwater Biofiltration System, Waterworks, Site Furnishings (Bike Rack, Trash Receptacle, etc.), Erosion Control, Speed Cushion, Geotextiles, Misc. Metals, Tree Grates, Boulders and Traffic Control Items. Project Scope: The work consists in general of approximately 2.8 miles of Class II and Class IV bikeway along University Avenue between Estrella Avenue and 69th Street within the City of San Diego and approximately 0.25 miles of Bike Boulevard improvements on Estrella Avenue between Orange Avenue and University Avenue. Roadway improvements are required to accommodate the bikeway. Features include raised concrete medians, concrete curb & gutter, asphalt concrete dike, bus islands, a protected intersection, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping. Work includes, but not limited to, controlling for water pollution; traffic control; erosion control; clearing and grubbing; curb, gutter, cross gutter, driveway, colored concrete, and sidewalk work; roadway excavation; imported borrow; asphalt concrete pavement; PCC pavement; landscaping and irrigation; proprietary BMPs; wayfinding signage; pavement markings and signage; street lighting; trenching and backfill for underground electric conduits; water appurtenances and fire hydrant relocations; storm drain installation; traffic signal modifications. Additive alternate A consists of pavement rehabilitation and associated curb ramps, traffic signal modifications and other appurtenant work associated with rehabilitating the roadway along University Avenue. BID DATE: April 10th at 2:30PST/PDT REYES CONSTRUCTION, INC. State License Number 507561 1383 South Signal Drive, Pomona, CA 91766 Phone: 909-622-2259 ? Fax: 909-622-3053 Contact: Christina Ramos Mon - Fri 8:00 AM - 4:30 PM Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance. By submitting a proposal, Respondent/Bidder acknowledges that they have performed a thorough review of the terms and conditions contained in our standard subcontract/purchase order (Contract). Respondent/Bidder quotes, including terms and conditions contained therein, will not be included in subcontracts/purchase orders issued for the project. Respondent/Bidder shall submit, in writing with their proposal/quote, any exceptions to the RCI Contract terms and conditions. Note: RCI may disqualify and reject the respondent’s proposal/bid based on the exceptions submitted. For information on the availability of scope of work, plans and specifications, and requirements of the contract please contact our office. Plans, Specifications, and Contract requirements can be viewed online at no cost here: 1) Via iSqFt – please send an email request to estimating@reyesconstruction.com 2) Bidnet Direct - https://www.bidnetdirect.com/private/supplier/solicitations/search 3) Via Sharefile – please send an email request to estimating@reyesconstruction.com REYES CONSTRUCTION, INC. - North Park/Mid-City Bikeways: University Bikeway Rebid Email To Friend« Go Back |
|